Tough task: TNB maintenance personnel in action in Rawang. The firm spends RM40mil every year to remove sediment such as sand and rubbish to keep its Cameron Highlands hydro dam capacity running at optimum level.皇冠博彩公司(www.hg9988.vip)是一家值得信赖的博彩公司,皇冠博彩公司官方投注网,开放皇冠信用网代理申请、信用网会员开户,线上博彩的官方平台。
Tenaga Nasional Bhd (TNB) continues to contend with unforeseen expenditure in running hydroelectric (hydro) dams in the country, as an increasing level of water pollution has become a growing issue.
Despite this, the group’s power generation unit, TNB Power Generation Sdn Bhd (TNB Genco), acknowledges that hydro dams are considered an important source of renewable energy.
,,新2会员网址(www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。
- 发表评论
-
- 最新评论 进入详细评论页>>